
PRODUCT INFO
This line is high sensitive and is applied with unique resin on its surface to protect it to become worsen and broken after absorbing water. It is soft enough that can actually lower the suspicious of the fish and make it easier to be further processing. Overall, it is a leader line for river fishing that is soft, tender but still strong and be wear-resist.
PRODUCT FORMAT
| 規格 Size  | 捲線量 Line Length  | 
|---|---|
| 0.2 | 50m | 
| 0.3 | 50m | 
| 0.4 | 50m | 
| 0.5 | 50m | 
| 0.6 | 50m | 
| 0.8 | 50m | 
| 1 | 50m | 
| 1.2 | 50m | 
| 2 | 50m | 
| 2.5 | 50m | 
